26 September 2011

Revit Server Quick Reference


To connect to the Revit Server Administrator for the first time:
In a browser window, enter the following: http://<ServerName>/RevitServerAdmin
For example, if your server name is Cenpr414, enter the following:
 http://Cenpr414/RevitServerAdmin

Ensure that you enter the correct server name in the specified location.


The Revit Server Administrator web-based tool displays. Use the Add to Favorites option or create a shortcut for future access.

Connecting to a Local Revit Server:

  1. Click in Revit program Collaborate tab>Synchronize panel> Connect to Revit Server
  2. In the Connect to Revit Server dialog, enter the server name or the IP address of the server. Note: You cannot change to a different Revit local server if multiple Revit sessions are open, a server-based central model is open, or the local server is not available.
  3. Click connect.
    Once a valid connection is established, the successful connection status icon displays and the server name updates.
  4. Click Close.

     

    26 August 2011

    Collaboration

    The latest issue of AUGIWorld is full of Collaboration articles. To name a few concerning Revit which might interest you here as follows:

    • Revit Collaboration: Then and Now: Troy Gates looks back on how collaboration workflow once worked in Autodesk Revit, and how it is done today. An emerging technology is also making inroads.

    • Collaboration with Revit Structure—Work Sharing: Phil Russo takes you step by step through collaboration in Revit Structure. Lots of tips and tricks here.

    • Collaboration and Data Management for AEC Projects: What’s Autodesk’s vision for collaborating with the Revit platform?  It’s 360. Revit Design Product Line Manager Anthony Hauck elaborates.

    The direct link to the issue:


    23 July 2011

    Linking One Revit File Into Another

    - Before linking, clean up the file before linking (if possible).

         - Audit, detach from central, keep worksets
         - Check warnings, check links, consider deleting unnecessary

            elements, purge.

    - Remember the Revit linked files/worksets rule!
    - Map Phases if needed

    - Multi-discipline firm? Consider only linking copies of central files.
    - Sending files? Consider Autodesk Labs eTransmit for Revit 2012.


    Source: Imaginit Technologies

    26 June 2011

    Revit Memory Usage Explained

    Below is a quick video explaining how Revit uses memory, as well as ways to best optimize your system for best performance.

    http://vimeo.com/16251172

    Don't lose your Revit memory!

    Source: Microsol Resources